• Shutdown, supervision, labour and equipment hire
• Multi-discipline industrial construction and maintenance
• Machinery Recovery Specialists
|
 |
 |
|
Site Maintenance Services
Including detailed CPM networks and Gantt charts to ensure timely shutdowns Ship Loader modifications
|
Site Maintenance Services
Rotary Breaker removal and re-tyre in progress at Rio
Tinto Blair Athol Coal
|
 |
 |
Ship Unloader balanced ready for Slew Bearing
replacement
|
Slew Bearing removal in progress
|
 |
 |
In-Situ Machining Slew Bearing upper and lower
path prior to re-installation of the bearing
|
DRE11 Incident
After slipping from a bridge inwet weather
|
 |
 |
DRE11 Recovery
Team Engineering Project Managed the Recovery including excavation, boom removal, leveling temporary boom counterweight, re-commissioning and walk to the High Wall
|
HPS SL1 Repair
The boom on HPS SL1 was struck by a ship
which required removal for repair |