 |
 |
Heavy Lift Specification and Execution
190T Three Crane Lift to transfer a Dragline Boom |
Conveyor Installation
Crinum East conveyor rollout
|
 |
 |
Weighing and Center of Gravity Testing
Execution of in situ weighing of 1200T rail mounted shiploader four bogies simultaneously at Dalrymple Bay
|
100T hydraulic jack and Load Cell under bogie
|
 |
.jpg) |
|
Hydraulic Power Pack and
Weighing Equipment Readout
|
Specification and Scope of Work Preparation
Design and Installation of 20 litre/sec high pressure water booster pump and 600m pipeline. |